Make OR Break Factor

Given the extent of damage, the toughest part was deciding which RCC members to repair first and which ones later.

THE CHALLENGE :

  • All RCC members of this multi-product plant had been exposed to an extensive 16-hour long fire and were damaged as a result.

THE ODDS :

  • Top priority was the selection of the RCC members to undergo repair, so as to avoid local collapse and the inevitable human casualty as a result.

OUR RESPONSE :

  • An intensive evaluation of the damage was undertaken and a customized retrofit method was evolved
  • All damaged core sections of concrete were grouted and patch repair done to the damaged concrete sections