Secondary Crusher In Cement Plant

1

Damaged RCC beam and slab

2

Beam after replacement of bottom cover portion

3

Slab and beam after completion of patch repair

4

Drilling on slab for grouting

5

Structure after completion of repair

Make OR Break Factor

Because of severe space constraints, conventional systems could not be adapted, and improvisations had to be made.

THE CHALLENGE :

  • All RCC members had been exposed to a fire explosion and were suffering considerable local damage thus compromising safety of the staff as well as posing an environmental threat.

THE ODDS :

  • All work had to be completed within the 20-day shutdown period.

OUR RESPONSE :

  • Initially, the damage was evaluated and the existing design was assessed, on the basis of which a retrofit method was provided
  • We grouted the damaged core sections of concrete while patch repaired the damaged concrete sections and reinforced some of the structural members with fibre-wrapping system